Saturday, November 28, 2009

A time to build

What a difference. What a difference a day makes. And new countertops (budget IKEA butcherblock). And a new faucet (Hansgrohe Metro from Costco). And a new fridge (Samsung from Lowe's). The kitchen looks fantastic. Well. Okay. Ignore the duct tape/aged sheet vinyl patchwork flooring. Other than that. And the halfway demolished cabinetry on the refrigerator wall. Maybe somewhat improved is a more accurate term.

The countertop hasn't been permanently affixed yet. It needs multiple layers of Waterlox, and the sink needs to be caulked. But the fridge is cold and full of food. The water is running. And I am beyond thrilled. So thrilled that I'm about to slap on a white subway backsplash, get the abatement people to just cut around the existing cabinets, and call it a day. Not really, but for now, I'm going to enjoy.

Some photos:

The old version. Note the metal-framed insets of some flimsy plasticky material. The frame trapped crumbs and would allow some to fall through to the drawers below. Ewww.



New:


No comments:

Post a Comment

Thanks so much for commenting. I love reading your thoughts and responses.